
Why Brazil's electric power sector needs to be restructured

Brazil’s government will submit a proposal to congress to restructure the electric power sector and correct distortions that have raised the cost of the service disproportionately between states.
The situation is due to asymmetries created over the last few years for various reasons, such as borrowing at high interest rates as part of so-called COVID and water scarcity accounts, mines and energy minister Alexandre Silveira said in a statement.
Alexei Vivan, partner at Schmidt Valois Advogados and president of electricity companies association ABCE, believes the proposal will replace the electric power sector’s modernization bill (PL 414), which has been stuck in congress for years.
But Vivan hopes that relevant points of the bill will be revisited and included in the government’s proposal, such as the separation of potency and energy, which, in practice, means to value the attributes of each energy source.
For example, the dispatchable quality of hydroelectric plants with reservoirs and thermal plants can be guaranteed at any time, but wind and solar power is intermittent.
Brazil has already held backup capacity tenders specifically designed to enhance the grid's reliability.
On the other hand, renewable energy should be remunerated for its ESG advantages, as should plants that are closer to the consumption center and require lower transmission investment.
Another essential point, Vivan said, is to think about reducing subsidies. "In the past, there was a policy of subsidies to make new energy sources viable, but this is no longer sustainable," he told BNamericas.
"And anything that isn't related to the electricity sector shouldn't be included in the power rate, as it’s today via the CDE [energy development account]."
Also to be debated are changes to the methodology for defining the price for settling differences, which is the reference price in the free market; the separation of electricity rates for the use of the energy grid by consumers in the regulated market; and the complete opening of the free market, with attention to the sustainability of distributors.
Power distribution concessionaires who have been contracting energy for years, via auctions held by watchdog Aneel, suffer from an excess of energy purchased, mainly due to growing migration of consumers from the regulated to the free market and the expansion of distributed generation.
"Part of this has been resolved with some contract transfers and bilateral negotiations that have been allowed, but there’s still over-contracting. It's a complex situation because we have a very large surplus of energy and many projects standing in line to start operating," Vivan said.
Subscribe to the leading business intelligence platform in Latin America with different tools for Providers, Contractors, Operators, Government, Legal, Financial and Insurance industries.
News in: Electric Power (Brazil)

NTS and GEO partner to study renewable gas transportation
Companies will seek opportunities to develop logistics dedicated to advanced fuels such as biogas and biogenic carbon

Brazil energy policy roundup: OPEC+, pre-salt blocks, IEA & Irena, nuclear power and more
BNamericas takes a look at the federal government’s latest resolutions.
Subscribe to Latin America’s most trusted business intelligence platform.
Other projects in: Electric Power (Brazil)
Get critical information about thousands of Electric Power projects in Latin America: what stages they're in, capex, related companies, contacts and more.
- Project: Lot 15: São João do Paraíso transmission lines, Padre Paraíso 2, Mutum
- Current stage:
- Updated:
2 weeks ago
- Project: Lagoinha IV photovoltaic plant (Lagoinha photovoltaic complex)
- Current stage:
- Updated:
2 weeks ago
- Project: Taim Geração offshore wind farm
- Current stage:
- Updated:
2 weeks ago
- Project: Barra do Chuí Geração offshore wind farm
- Current stage:
- Updated:
2 weeks ago
- Project: Araras Geração offshore wind farm
- Current stage:
- Updated:
2 weeks ago
- Project: Farol de Mostardas Geração offshore wind farm
- Current stage:
- Updated:
2 weeks ago
- Project: Querência Geração offshore wind farm
- Current stage:
- Updated:
2 weeks ago
- Project: Tatajuba Geração offshore wind farm
- Current stage:
- Updated:
2 weeks ago
- Project: Solar Irecê 3 photovoltaic plant (Solar Irecê photovoltaic complex)
- Current stage:
- Updated:
2 weeks ago
- Project: Solar Irecê photovoltaic plant (Solar Irecê photovoltaic complex)
- Current stage:
- Updated:
2 weeks ago
Other companies in: Electric Power (Brazil)
Get critical information about thousands of Electric Power companies in Latin America: their projects, contacts, shareholders, related news and more.
- Company: Complexo Fotovoltaico Carnauba Solar III SPE Ltda.  (Carnauba Solar III)
-
The description included in this profile was taken directly from an AI source and has not been edited or modified by BNamericas researchers. However, it may have been automatica...
- Company: Solar Volt Solucoes Comercio e Instalacao Para Energia Ltda.  (SolarVolt)
-
The description contained in this profile was taken directly from an official source and has not been edited or modified by BNamericas researchers, but may have been machine tra...
- Company: Contour Global do Brasil Holding  (Contour Global do Brasil)
-
The description contained in this profile was extracted directly from an official source and has not been edited or modified by BNamericas researchers, but may have been machine...
- Company: Lumus Solar
-
The description contained in this profile was extracted directly from an official source and has not been edited or modified by BNamericas researchers, but may have been machine...
- Company: Consorcio Lagoinha I