
Spotlight: Chile’s US$4.7bn concessions agenda for 2022

Chile’s concession agenda for next year includes tenders for 12 contracts involving around US$4.7bn, lower than the US$6.1bn scheduled for 2021 but still well above the annual average seen between 2010 and 2018.
“It should be noted that we have pressured [budget office] Dipres, we have pressured the social development ministry and they have supported us to be able to present these figures,” Marcela Hernández, head of the concessions office of the public works ministry (MOP) told a congressional budget committee.
The tenders scheduled for 2022 are the following:
Q1
Los Lagos airport network (US$110mn): Involves the operation of the Puerto Montt, Osorno and Chiloé airports in the Los Lagos region of southern Chile.
The Puerto Montt airport is currently operated under a US$30mn concession awarded in 2018 to a consortium formed by Spanish group Sacyr and local firm Agunsa. The contract is set to expire in May 2024.
Meanwhile, the new contract would add the airports of Osorno and Chiloé island to the concession.
Q2
Atacama regional airport, second concession (US$79mn): Involves expanding the passenger terminal of the airport from the current 1,700m2 to 4,700m2, among other infrastructure upgrades.
The current concession was awarded to Sociedad Concesionaria Aeropuerto Regional de Atacama in 2002 and it is set to expire in May 2023.
Santiago airport light train (US$425mn): Originally presented as a private initiative by Engie, it entails a 12.5km light rail line linking Santiago’s international airport to two lines of the city’s metro system (lines No. 1 and No. 5).
Alto Hospicio-Iquique cable car (US$84mn, pictured): Consists of a 5.5km cable car line with three stations, which would link the city of Iquique (Tarapacá region) to neighboring Alto Hospicio.
Route 5 highway, Santiago-Los Vilos stretch (US$768mn): Involves the operation and improvement of 218km of the north-south artery between the capital and the port city of Los Vilos (Coquimbo region).
Works include widening some sections, replacing bridges building new access roads.
The road’s current operator is Globalvía subsidiary Autopista del Aconcagua, whose contract was awarded in 1996 and is due to come to an end in June 2024.
Concepción north access (US$460mn): Entails improving a 75km stretch of roadway linking route 5 with route 150CH in the south-central Biobío region. Works include improvements to the current road, new bridges and service lanes.
The current concessionaire for this road is Globalvía subsidiary Autopista del Itata and its contract will expire in April 2023.
Route 5 highway. Temuco-Río Bueno stretch and Valdivia access (US$734mn): Involves improving 172km between the city of Temuco (Araucanía region) and Río Bueno (Los Ríos), plus the construction of a new 100km access road for regional capital Valdivia.
The Temuco-Río Bueno stretch has been operated by Isa Intervial subsidiary Ruta de Los Ríos since 1998 and the contract runs for 27 years and will therefore expire in 2025.
Route 5 highway. Antofagasta-Caldera stretch (US$628mn): Consists of widening 470km between the city of Antofagasta and Caldera (Atacama region).
This section of route 5 has not been operated under a concession before.
Route 5 highway. Iquique-Antofagasta stretch (US$402mn): Involves widening a 370km stretch of highway between Iquique and Antofagasta.
Like the Antofagasta-Caldera project, this consists of a new concession.
Q3
Zapallar reservoir (US$357mn): Entails building a dam with capacity for 80Mm3 (million cubic meters) and a 430m contention wall that will provide water for 10,000 hectares of land in the south-central Ñuble region.
Q4
Copiulemu-Hualqui-Puerto Coronel road corridor (US$144mn): Consists of building a 38.7km corridor linking the O-50 and 160 roads in the Biobío region.
Works also include a 1.8km bridge over the Biobío River. The road is expected to serve as an alternative access to Puerto Coronel.
Villarrica highway (US$512mn): Involves widening a 48km stretch of the 199-CH road, which links the municipalities of Freire and Villarrica (Araucanía), plus a new road linking Villarrica and the tourist hotspot of Pucón, for a total of 86km.
So far this year there have been six concession tenders worth over US$2bn, which surpasses the record US$1.9bn seen in 1996, and an additional 11 are planned for the remainder of the year.
Three of these tenders, which involve the O’Higgins health network (US$159mn), the national cancer institute (US$197mn) and the national neurosurgery institute (US$168mn), will be launched this month.
Subscribe to the leading business intelligence platform in Latin America with different tools for Providers, Contractors, Operators, Government, Legal, Financial and Insurance industries.
News in: Water & Waste (Chile)

Spotlight: Chile plans US$11bn in 2025 concessions
This year is expected to see the country’s first light rail concession tender, while authorities also hope to auction a US$3.8bn rail link between ...

Chile defense ministry greenlights Magallanes maritime ammonia terminal
The terminal is a component of a feasibility-stage exporting project, which still requires an environmental license and multiple other permits.
Subscribe to Latin America’s most trusted business intelligence platform.
Other projects in: Water & Waste (Chile)
Get critical information about thousands of Water & Waste projects in Latin America: what stages they're in, capex, related companies, contacts and more.
- Project: Installation of the APR system in Pedregoso, Freire
- Current stage:
- Updated:
4 months ago
- Project: Improvement and expansion of the Placilla district system towards La Leonera
- Current stage:
- Updated:
4 months ago
- Project: Rural health service improvement Casablanca commune of Putaendo province of San Felipe
- Current stage:
- Updated:
4 months ago
- Project: Reposition of the rural health service in Río Tranquilo, Río Ibañez commune
- Current stage:
- Updated:
4 months ago
- Project: Improvement and expansion of the Pupuya SSR in the commune of Navidad (third call)
- Current stage:
- Updated:
4 months ago
- Project: Construction of the SSR El Taco, Lampa commune, fourth call
- Current stage:
- Updated:
4 months ago
- Project: Improvement of the Coquimbito-Altovalsol water system in the municipality of La Serena
- Current stage:
- Updated:
4 months ago
- Project: Construction of rural health service in Tucapel Alto, Cañete commune, (third call)
- Current stage:
- Updated:
4 months ago
- Project: Construction of the Aall Quilque system, stage 1, Los Angeles, Biobio
- Current stage:
- Updated:
4 months ago
- Project: Construccion servicio apr de la isla, lance
- Current stage:
- Updated:
4 months ago
Other companies in: Water & Waste (Chile)
Get critical information about thousands of Water & Waste companies in Latin America: their projects, contacts, shareholders, related news and more.
- Company: Captiva Ingeniería
-
The description contained in this profile was extracted directly from an official source and has not been edited or modified by BNamericas researchers, but may have been machine...
- Company: KSB Chile S.A.
-
The Chilean subsidiary of KSB, manufacturer and distributor of industrial pumps and valves, was established in 1994. It has seven branches throughout the country (Iquique, Antof...
- Company: Almar Water Servicios Latam S.A.
-
The description contained in this profile was taken directly from an official source and has not been edited or modified by BNamericas researchers, but may have been automatical...
- Company: Cementos Bío Bío S.A.  (Cementos Bio Bio)
-
Chilean cement producer Cementos Bío Bío produces and sells building materials for construction and mining projects. Its operations are divided into two business areas: Cement, ...
- Company: Aguas San Pedro S.A.  (Aguas San Pedro)
-
Aguas San Pedro is a provider of potable water and sewage services in six districts in three regions of Chile: Colina and Buin (Metropolitan region); Coronel, San Pedro de la Pa...
- Company: Veolia SU Chile S.A.  (Veolia Chile)
-
Veolia SU Chile S.A. (Veolia Chile) is a subsidiary of Spain's Proactiva Medio Ambiente, which is controlled by French firm Veolia Environnement, a global provider of environmen...
- Company: Aguas Pacífico SpA  (Aguas Pacífico)
-
Aguas Pacífico SpA, founded in 2016 by the Brazilian investment company Pátria Investimentos in Santiago de Chile, designs, finances, builds and operates seawater desalination p...
- Company: FLSmidth S.A.  (FLSmidth Chile)
-
Danish company with more than 140 years old positioned as the leading provider of technologies and services for the mining and cement industries around the world, expanding its ...
- Company: Empresa de Montajes Industriales Salfa S.A.  (Salfa Montajes)
-
The description included in this profile was taken directly from an official source and has not been modified or edited by BNamericas’ content team. However, it may have been au...