All projects
Page 105
Implementation of a Water Supply System in Rural Communities in the Municipality of Betânia
Friday, November 15, 2024
Execution of canalization works in Ibeirão dos Couros, Polder system (reservoir and rainwater pumping station) and microdrainage system
Friday, November 15, 2024
Avenue Paving
Friday, November 15, 2024
Cobblestone Paving in Urban Areas of Municipalities in the State of Piauí
Friday, November 15, 2024
Preparation of Studies and Projects - Pimentas Line Interconnection Corridor
Friday, November 15, 2024
Asphalt Paving in the Municipality of Presidente Dutra/MA
Friday, November 15, 2024
Pavement Reform on the Access Road to the Cotegipe Riverfront in the Municipality of Santa Izabel Do Oeste/PR
Friday, November 15, 2024
Implementation of an Urban Water Supply System in the Municipality of Placas/PA
Friday, November 15, 2024
Implementation of Water Supply Systems in Rural Communities in the Municipality of Caruaru/PE
Friday, November 15, 2024
Asphalt Paving on Access Road to Tourist Spot in the Municipality of São Raimundo Nonato - Pi.
Friday, November 15, 2024
Asphalt Paving of Pedras Brancas Road
Friday, November 15, 2024
Execution of remaining services from the Fortaleza Ring Road project, with a length of 32.30 km, located within the urban area of the metropolitan region of Fortaleza.
Friday, November 15, 2024
Provision of Engineering Services Related to the Implementation of Paving Works on Roads in the Municipality of Petrolina/PE.
Friday, November 15, 2024
Preparation of Studies and Projects for Micro and Macro Urban Drainage, Desilting and Recovery of Degraded Areas in the Municipality of Santa Maria/rs.
Friday, November 15, 2024
Implementation of Paving on Local Roads in the Municipalities of Iracema and Mucajaí - Rr.
Friday, November 15, 2024
Block Paving in Municipalities in the State of Maranhão
Friday, November 15, 2024
Paving of a rural road in the municipality of Manaquiri/am
Friday, November 15, 2024
Graveling of Rural Roads
Friday, November 15, 2024
Tsd Type Asphalt Paving.
Friday, November 15, 2024
Pavement Recovery Services/Paving on Urban Roads in the Municipality of Mendes-rj
Friday, November 15, 2024
Recovery of Country Roads with Primary Treatment
Friday, November 15, 2024
Restoration of Pi-211, on the stretch between Joaquim Pires - Pi and the junction of BR-343.
Friday, November 15, 2024
Works to Improve Urban Drainage Infrastructure, Aiming to Reduce the Risk of Flooding, Floods and Inundations - Igarapé Ariri Canal
Friday, November 15, 2024
Execution of the Works for the Recovery and Modernization of the Quixabinha Dam, in the State of Ceará
Friday, November 15, 2024
Paving and Qualification of the Intendente Antônio Damasco Road, Ratones
Friday, November 15, 2024
Redevelopment of Cascavel Stream - Section: Padre Wendel Avenue - East-West Avenue
Friday, November 15, 2024
Drainage of the Aba Motors and Rotary Region
Friday, November 15, 2024
Paving in Vitória Park
Friday, November 15, 2024
Ppcip Implementation Work
Friday, November 15, 2024
Execution of Recovery Services for Several Dnocs Dams in the State of Ceará - Prosb 4
Friday, November 15, 2024
Urban Paving in Diamantino
Friday, November 15, 2024
Road Restoration in Rural Areas
Friday, November 15, 2024
Construction of Channels and Galleries in Risk Areas in the Municipality of Barcarenapa, Through the New Pac
Friday, November 15, 2024
Paving of Ring Road Aiming at Urban Mobility on the Streets of Girau Do Ponciano - Al.
Friday, November 15, 2024
Reform of the SND and Morgue
Friday, November 15, 2024
Restoration of Pi-110 in the sections between the municipalities of Barras and Batalha
Friday, November 15, 2024
Implementation of a new water supply network named Adutora Do Passatempo.
Friday, November 15, 2024
Implementation of a Water Supply System in the Urban Area of the Municipality of Coroatá/MA.
Friday, November 15, 2024
Re-adaptation of the Macro and Microdrainage Network of the Cadaval Stream
Friday, November 15, 2024
Macrodrainage of Canasvieiras
Friday, November 15, 2024