
Chinese firm submits best offer for US$274mn hospital concession in Chile

This is a machine translation of the original ministry of public works release in Spanish.
Today the bid opening act was held for the Coquimbo hospital concession, which includes an investment of UF 6,528,211 (approximately US$274 million) for the replacement of a highly complex hospital in the district and region of the same name. The offer from Grupo CRCC Chile was the most favorable for the state, since it considered a fixed subsidy for construction (SFC) of UF 421,168 and a fixed subsidy for operation (SFO) of UF 135,700.
For this concession, which considers a 15-year term of operation, four offers were presented on January 10, including, in addition to the winner, those of Obrascón Huarte Lain, Agencia en Chile , Consorcio Sacyr and Acciona Hospital Concessions. Now the administrative procedures are beginning to be able to award this work during the first quarter of this year, which would allow the construction stage to begin in the second half of 2023, generating a peak of 2,200 direct jobs per month. The entry into operation of the new Coquimbo hospital is estimated for 2027.
The general director (acting) of concessions, Luis Felipe Elton, highlighted the great benefit that the construction of two concession hospitals in the Coquimbo region will mean. “Currently this region is the one with the greatest deficit of hospital beds in the country, hence the importance of the Coquimbo hospital and the La Serena hospital, which is currently in the stage of being awarded to Acciona Concesiones Hospitalarias, since it will allow the normalization of bed coverage. In the specific case of the Coquimbo hospital, 605 beds will be available, including 72 critical patient beds, in addition to 22 wards. Together with the 668 beds that the La Serena hospital will provide, a total of 1,273 new beds will be available for the region.”
The new Coquimbo hospital will replace the current facility and provide highly complex care to nearly 723,000 inhabitants of the districts of Coquimbo and Andacollo, in addition to those of Illapel, Salamanca, Canela and Los Vilos, belonging to the province of Choapa.
The facility will have an area of 132,000 m2 and 605 beds, distributed among 457 basic and intermediate care beds, 72 critical patient beds, 18 rehabilitation beds, 24 pension beds and 34 mental health beds. Likewise, it will have 22 wards; 85 boxes for medical, dental and non-medical consultations; six comprehensive childbirth care rooms and an emergency service, among others.
This concession is part of the second concession program for health establishments in which, to date, bids have been called for 18 of the 19 hospitals promised by this administration, with three projects awarded so far, which are the Maule network (Cauquenes, Constitución and Parral), Buin-Paine and the Biobío network (Santa Bárbara, Nacimiento, Coronel and Lota).
Subscribe to the leading business intelligence platform in Latin America with different tools for Providers, Contractors, Operators, Government, Legal, Financial and Insurance industries.
News in: Infrastructure (Chile)

Chile key to Sacyr’s record project backlog
At the end of 2024, concessions represented 71% of the Spanish firm’s total backlog, up from 51% at end-2023, with Chile being its main market in L...

Beyond Santiago: How electromobility is advancing in Chile
Electric buses are heading to regional cities, while electric trucks are also advancing in key sectors such as mining.
Subscribe to Latin America’s most trusted business intelligence platform.
Other projects in: Infrastructure (Chile)
Get critical information about thousands of Infrastructure projects in Latin America: what stages they're in, capex, related companies, contacts and more.
- Project: Iquique - Alto Hospicio Cable Car
- Current stage:
- Updated: 3 months ago
- Project: Chacao bridge
- Current stage:
- Updated: 3 months ago
- Project: Route 5 South Highway , Bypass to the City of Curicó
- Current stage:
- Updated: 3 months ago
- Project: HNH Energy
- Current stage:
- Updated: 3 months ago
- Project: Improvement of section 6 of the Américo Vespucio Nor-Poniente System Concession, Av. El Salto-Route 78
- Current stage:
- Updated: 3 months ago
- Project: North Access Road Connection to San Antonio
- Current stage:
- Updated: 3 months ago
- Project: Limache - Port train extension to Quillota and La Calera
- Current stage:
- Updated: 3 months ago
- Project: Chacalluta airport expansion and improvement (Second Concession)
- Current stage:
- Updated: 3 months ago
- Project: Bypass Route E-85, Urban section of the city of Los Andes (New connection Los Andes - San Esteban and widening of the David García Bridge)
- Current stage:
- Updated: 3 months ago
- Project: Second Concession Route 5 Santiago - Los Vilos
- Current stage:
- Updated: 3 months ago
Other companies in: Infrastructure (Chile)
Get critical information about thousands of Infrastructure companies in Latin America: their projects, contacts, shareholders, related news and more.
- Company: Servicio de Salud Aysén del General Carlos Ibañez de Campo (Servicio de Salud Aysén)
- The Aysén Health Service (Servicio de Salud Aysén), under the Ministry of Health, is the state body in charge of providing health services in the Region of Aysén, located in sou...
- Company: Terminal Graneles del Norte S.A (Terminal Graneles del Norte S.A (TGN))
- Terminal Graneles del Norte S.A. (TGN) operates the solid bulk cargo terminal in the Chilean port of Mejillones, which is located 65km from the city of Antofagasta. The company ...
- Company: Puerto Columbo S.A. (Puerto Columbo)
- The description contained in this profile was extracted directly from an official source and has not been edited or modified by BNamericas researchers, but may have been machine...
- Company: Servicio de Salud Atacama
- The description contained in this profile was extracted directly from an official source and has not been edited or modified by BNamericas researchers, but may have been machine...
- Company: San Martin y Pascal Ltda.
- Company: Hellmuth, Obata y Kassabaum, Inc.
- Company: BEV S.A.
- Company: Consorcio Triconsul
- Company: Ferrostaal Chile S.A.C.
- Comprehensive tailor-made solutions for the Industrial Plants, Maintenance, Transportation and Services sectors. Equipment and services for large mining and industry, solutions ...
- Company: Dirección General de Concesiones del Ministerio de Obras Públicas de la República de Chile (DGC Chile)
- The description included in this profile was taken directly from an official source and has not been modified or edited by BNamericas’ content team. However, it may have been au...