NDCs 3.0 a ‘Make or Break’ for Global Goal to Triple Renewables by 2030
IRENA release
Abu Dhabi, United Arab Emirates / Baku, Azerbaijan, 11 November 2024 – Even if all COP announcements to date were to be fully implemented, a significant CO2 emission gap would still need to be closed by 2050, according to IRENA’s World Energy Transitions Outlook 2024.
Released at the opening of the UN Climate Conference COP29 in Baku, Azerbaijan, the Agency’s 1.5°C Scenario outlines a net-zero path by midcentury, offering a framework for governments to develop energy transition strategies that better align energy planning with climate policies to channel investment.
The Outlook shows that current country pledges could cut global energy-related CO2 emissions by 3% by 2030 and 51% by 2050. Achieving the global goals of tripling renewable power capacity and doubling energy efficiency by 2030, as agreed at COP28, would keep the energy transition on track for net-zero emissions by 2050. These 2030 targets are crucial to limiting global temperature rise to below 1.5°C, as underscored by the UAE Consensus.
However, a significant gap remains between political announcements and actual county plans and policies. National plans and targets are set to deliver only half of the required growth in renewable power by 2030. Investments in renewable power, grids and flexibility, energy efficiency and conservation must increase dramatically to meet the renewable energy and efficiency goals, totalling USD 31.5 trillion from 2024-2030.
There are also large geographical disparities in terms of renewable additions and investments, causing inequalities in the global energy transition. While renewable investment has generally been on the rise, it remains concentrated in a few countries, leaving much of the Global South behind.
Moreover, with over 70% energy supply, fossil fuels continue to dominate the energy mix in several of the biggest economies, the world’s largest CO2 emitters. To meet the 1.5°C target, the G20 must triple its installed renewable power capacity by 2030, reaching 9,400 gigawatts (GW), and expand it seven-fold by 2050 to 24,900 GW, compared to 2023 levels.
“NDCs 3.0 provide the last opportunity this decade for countries to step up their stated ambitions.”
We have reached crunch time. A robust global finance deal and the next NDCs in 2025 are ‘make or break’ moments to keep 1.5°C alive. NDCs 3.0 provide the last opportunity this decade for countries to step up their stated ambitions. Particularly, an agreement on a new quantified goal for climate finance at COP29 is critical to ensure a just transition, support investments in the Global South and empower countries to step up their NDC ambitions. 1.5°C hinges on efforts by G20 countries. Their NDCs must match global commitments to triple renewable power capacity and double energy efficiency by 2030.
Under IRENA’s 1.5°C Scenario, renewable energy sources would provide the bulk of the power mix, accounting for 68% and 91% of the total electricity supply by 2030 and 2050, respectively. By 2050, a deep transformation of the power and end-use sectors is required to enable the high shares of renewable energy required by the transition.
Globally, the expansion of renewable electricity will facilitate the transition away from fossil fuels in the power sector. Fossil fuels will significantly shrink from a dominant share of 61% in the global power generation mix today, to 24% by 2030 and further to 4% by 2050.
Transitioning the current power system from fossil fuels to renewables requires stronger and more flexible power grid networks. This can be provided by energy storage solutions, demand-side management, and sector coupling technologies and strategies. Particularly, energy storage is one technical key enabler towards a fully decarbonised, 100% renewable power system.
As countries prepare for the third round of NDCs in 2025, it is crucial that they better align with national energy plans and net-zero targets. IRENA is already working with 101 Parties of the Paris Agreement on the upgrade and implementation of NDCs. Coherent national energy and climate strategies facilitate transparency, attract investment, and accelerate the transition to a low-carbon, resilient economy.
International collaboration can secure the significant increase in finance needed for a just transition that maximises socio-economic benefits. This could be facilitated by new sources of funding such as the global wealth tax championed by this year’s G20, emphasising equity, social or environmental responsibility.
There is also a need for huge amounts of public finance to de-risk projects in high-risk countries and fund crucial infrastructure. Such funding could in part come from a reduction in fossil fuel subsidies.
Subscribe to the leading business intelligence platform in Latin America with different tools for Providers, Contractors, Operators, Government, Legal, Financial and Insurance industries.
News in: Electric Power (Mexico)
CloudHQ breaks ground on power infra for Mexican datacenter campus
The full campus will include six buildings, each with 48MW of IT capacity, for a total IT load of 288MW.
Trina Storage consolidates its leadership in energy storage in Latin America and the Caribbean: Tier 1 recognition ...
Innovation and operational excellence drive Trina Storage’s continued leadership in the energy storage industry.
Subscribe to Latin America’s most trusted business intelligence platform.
Other projects in: Electric Power (Mexico)
Get critical information about thousands of Electric Power projects in Latin America: what stages they're in, capex, related companies, contacts and more.
- Project: Aguascalientes II Solar Ecopark
- Current stage:
- Updated:
3 months ago
- Project: Energía Los Cabos
- Current stage:
- Updated:
3 months ago
- Project: Jalisco solar park
- Current stage:
- Updated:
3 months ago
- Project: Civil and Electromechanical Works in Electrical Substations for the REI Project (Smart Grid) Fourth Stage, in the Area of the Celaya Distribution Zones (GRTC) Optical Fibers
- Current stage:
- Updated:
3 months ago
- Project: Construction of electrification works, package 67 2024, block 29, Resource Allocation Agreement FSUE-RL23-ER-06, Zacatecas Distribution Zone
- Current stage:
- Updated:
3 months ago
- Project: COMPLEMENTARY WORKS IN THE CONSTRUCTION OF THE CIVIL WORKS, ASSEMBLY AND SUPPLY OF POWER TRANSFORMERS FOR THE BUENTONO SF6 SE STAGE 2
- Current stage:
- Updated:
3 months ago
- Project: Expansion of 3 Electric Power Distribution Networks in several locations (La Era Kantulan, Los Libertadores and Los Olivos) in the Municipality of Ocosingo in the State of Chiapas.
- Current stage:
- Updated:
3 months ago
Other companies in: Electric Power (Mexico)
Get critical information about thousands of Electric Power companies in Latin America: their projects, contacts, shareholders, related news and more.
- Company: Eólica del Mayab, S.A.P.I. de C.V.  (Eólica del Mayab)
-
The description included in this profile was taken directly from an AI source and has not been edited or modified by BNamericas researchers. However, it may have been automatica...
- Company: Los Santos Solar II, S.A.P.I de C.V.  (Los Santos Solar II)
-
Los Santos Solar II, S.A.P.I de C.V. is a special purpose Mexican company created by the power project firm Buenavista Renewables which develops the 80-MW solar power plant Los ...
- Company: Iberia Renovables Durango S.A.P.I. de C.V.  (Iberia Renovables Durango)
-
The description included in this profile was taken directly from an AI source and has not been edited or modified by BNamericas researchers. However, it may have been automatica...
- Company: Atria Wind Farm 1 S.A.P.I. de C.V.  (Atria Wind Farm 1)
-
The description included in this profile was taken directly from an AI source and has not been edited or modified by BNamericas researchers. However, it may have been automatica...