138 kV Link San Rafael - Ananea Derivation, extensions and associated substations (ITC Project)
Get all the information on the 138 kV Link San Rafael - Ananea Derivation, extensions and associated substations (ITC Project), a Electric Power project. Connect with the contracted companies and their key contacts, track the project stage and milestones, read related news and more. Some issues around this topic are: Transmission Lines and Substations. Write to us at info@bnamericas.com or call us at +56 (2) 29410300 to schedule a demonstration of our platform.Description: The project includes the construction of the following facilities: Construction of new San Rafael 138 kV Derivation substation. Expansion of the Ananea substation at the 138 kV and 60 kV levels to obtain 138/60 kV transformation capacity. 138 kV transmission line San Rafael – Ananea Derivation, double-stranded, 120 MVA design power and 104.7 km in total length. Connection link at 138 kV Derivación San Rafael – San Rafael, with a double triple and 1.43 km in length, which starts from the Derivación San Rafael substation to a sectioning point of the lines San Rafael – El Ángel (L-1051) and San Rafael – Azángaro (L-1009), with the same driver. Connection link at 138 kV San Rafael Derivation to the sectioning point of the lines San Gabán II - Azángaro (L-1010) and San Rafael to El Ángel (L-1051), of double triple and 0.56 km in length, which starts from the San Rafael Derivation substation to a sectioning point of the aforementioned lines L-1010/L-1051, with the same conductor. Connection link at 138 kV San Rafael Derivation to the sectioning point of the San Rafael – Azángaro lines (L-1009) and San Gabán II – Azángaro lines (L-1010), with double triples and 1.31 km in length, which starts from the San Rafael Derivation substation to a sectioning point of the aforementioned lines LT 1009/1010, with the same conductor. The project, located in the department of Puno, aims to improve the reliability of the transmission system in the area served at the 60 kV level by the Azángaro and Ananea substations of the Ananea Electric System. Likewise, operating conditions are improved at the 138 kV level, in the current 138 kV San Gabán II-San Rafael-Azángaro transmission axis.
Subscribe to the leading business intelligence platform in Latin America with different tools for Providers, Contractors, Operators, Government, Legal, Financial and Insurance industries.
Related companies
Get valuable information on companies involved in the 138 kV Link San Rafael - Ananea Derivation, extensions and associated substations (ITC Project).
- Related companies
- Role: Owner
- Related companies
- Role: Concessionaire/Operator
- Related companies
- Role: Constructor
Key contacts
Obtain contact information on key people working at the 138 kV Link San Rafael - Ananea Derivation, extensions and associated substations (ITC Project).
- Name
- Position: CEO (Chief Executive Officer)
- Phone:
- Corporate email:
- Name
- Position: CFO (Chief Financial Officer)
- Phone:
- Corporate email:
- Name
- Position: Business Development Manager
- Phone:
- Corporate email:
- Name
- Position: Project Manager
- Phone:
- Corporate email:
- Name
- Position: Head of Procurement
- Phone:
- Corporate email:
- Name
- Position: HR Director
- Phone:
- Corporate email:
- Name
- Position: HR Director
- Phone:
- Corporate email:
- Name
- Position: Production manager
- Phone:
- Corporate email:
- Name
- Position: Marketing manager
- Phone:
- Corporate email:
- Name
- Position: COO (Chief Operating Officer)
- Phone:
- Corporate email:
Subscribe to Latin America’s most trusted business intelligence platform.
Other projects in: Electric Power
Get critical information about thousands of Electric Power projects in Latin America: what stages they're in, capex, related companies, contacts and more.
- Project: Pateiro 43 Photovoltaic Plant (Bahia, 24,975 MW)
- Current stage:
- Updated:
3 years ago
- Project: Photovoltaic Plant Selection 4 (Ceará, 40 MW)
- Current stage:
- Updated:
5 years ago
- Project: Photons of Saint Valentine 05
- Current stage:
- Updated:
1 year ago
- Project: Photovoltaic Plant P. solar ii (Bahia, 33.0 MW)
- Current stage:
- Updated:
3 years ago
- Project: Caxias I
- Current stage:
- Updated:
2 years ago
- Project: Solaris 36 Photovoltaic Plant (Piaui, 47,356 MW)
- Current stage:
- Updated:
3 years ago
- Project: Paineira 1
- Current stage:
- Updated:
6 months ago
- Project: Great Canoe VIII
- Current stage:
- Updated:
1 year ago
- Project: Serra do Mato V Wind Farm (Ceará, 21 MW)
- Current stage:
- Updated:
2 months ago
- Project: Photovoltaic Plant Solaris 138 (Minas Gerais, 50.0 MW)
- Current stage:
- Updated:
2 years ago
Other companies in: Electric Power
Get critical information about thousands of Electric Power companies in Latin America: their projects, contacts, shareholders, related news and more.
- Company: Cymi Do Brasil Projetos E Serviços Ltda.  (Cymi Do Brasil)
-
Cymi Brasil, part of the ACS group, is a company that works in several sectors of the industry, offering services such as high voltage electrical installations, transmission lin...
- Company: Capitanich Construcciones S.A.  (Capitanich Construcciones)
-
The description contained in this profile was extracted directly from an official source and has not been edited or modified by BNamericas researchers, but may have been machine...
- Company: UTE GNA II Geração de Energia Ltda.  (UTE GNA II Geração de Energia)
-
UTE GNA II Geração de Energia Ltda. (UTE GNA II) is a Brazilian power generation company established in 2015 and based in Rio de Janeiro which operates as a subsidiary of Gás Na...
- Company: Consorcio CCC Ituango
-
Consorcio CCC is a consortium led by Brazilian infrastructure firm Construções e Comércio Camargo Corrêa, which holds a 55% stake of the company, along with the Colombian Constr...
- Company: NP Energía La Lucha, S.A. de C.V.  (NP Energía La Lucha)
-
The description included in this profile was taken directly from an AI source and has not been edited or modified by BNamericas researchers. However, it may have been automatica...
- Company: Cristaria Solar SpA
- Company: Ministerio de Obras Públicas y Comunicaciones de la República del Paraguay  (MOPC Paraguay)
-
Paraguay's Ministry of Public Works and Communications (MOPC) is a government agency tasked with promoting and regulating public infrastructure projects, as well as designing, d...
- Company: Essentia Energia Renovável Spe Ltda.  (Essentia Energia)
-
The description included in this profile was taken directly from an official source and has not been modified or edited by the BNamericas’ researchers. However, it may have been...
- Company: Lightsource BP Renewable Energy Investments Limited  (Lightsource BP Brasil)
-
The description included in this profile was taken directly from an AI source and has not been edited or modified by BNamericas researchers. However, it may have been automatica...
News in: Electric Power
Auren Energia set to become one of Brazil’s top electric power companies
The company is nearing the conclusion of its acquisition of AES Brasil.
Power generation tests have started on the EMRE BEY ship
The Government has invested USD 28 million in energy infrastructure