Chile
Project Profile

7 Pad Hydraulic Fracturing In Arenal Block

Mining & Metals project in Chile, currently in the stage of Blurred

Get all the information on the 7 Pad Hydraulic Fracturing In Arenal Block, a Electric PowerMining & Metals and Oil & Gas project. Connect with the contracted companies and their key contacts, track the project stage and milestones, read related news and more. Some issues around this topic are: Natural GasOnshoreUpstream and Minerals & Metals. Write to us at info@bnamericas.com or call us at +56 (2) 29410300 to schedule a demonstration of our platform.

Description: This Project consists of carrying out the “hydraulic fracturing” process at the PADs Cabaña Norte 1, Cabaña Oeste 1, Lircay 1, Lircay Oeste ZG-1, Bardwick ZG-1, Cabaña 1 and Punta Piedra Oeste ZG-B of the Arenal Block. The fracturing process consists of a well stimulation technique, through the sustained injection of a fluid at such a pressure that it causes the rupture of the reservoir rock (increasing the contact area of the reservoir with the well), with the purpose of creating new channels or connecting existing flow channels, increasing the flow rate of the well and thus its productivity. The objective of Production is the extraction of hydrocarbons confined in the Glauconitic Formation, whose existence has been demonstrated by previous studies. This formation is located at an approximate depth of between 1,500 and 3,000 meters below mean sea level and will be accessed through the hydraulic fracturing of 7 PAD in the Arenal Block. The permeability of the rock in conventional hydrocarbon reservoirs (such as the case of Springhill in Magallanes), is approximately 5 to 1,500 millidarcy, however, in unconventional reservoirs, the permeability of the rock fluctuates between 0.001 to 0.04 millidarcy . Due to the low permeability, the fracturing operation is necessary, without which the extraction of confined hydrocarbons would not be possible. Table 1-1 shows the status of the Environmental Qualification Resolutions (RCA) corresponding to the drilling process of the wells that make up this project. Table 1-1 RCA of Drilling of each Well Associated with the Project Source: Own Elaboration, 2018 The objective of this Project is to increase the hydrocarbon productivity of 7 PAD located inside the Arenal block, through the hydraulic fracturing process in the Glauconitic Formation , a process that will increase the contact area of the reservoir with the surroundings of the wells, thus achieving the extraction of the hydrocarbons contained in the deposit at profitable flows.

Subscribe to the leading business intelligence platform in Latin America with different tools for Providers, Contractors, Operators, Government, Legal, Financial and Insurance industries.

Related companies

Get valuable information on companies involved in the 7 Pad Hydraulic Fracturing In Arenal Block.

  • Related companies Blurred
  • Role: Owner
  • Related companies Blurred
  • Role: Concessionaire/Operator
  • Related companies Blurred
  • Role: Constructor

Key contacts

Obtain contact information on key people working at the 7 Pad Hydraulic Fracturing In Arenal Block.

  • Name Blurred
  • Position: CEO (Chief Executive Officer)
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: CFO (Chief Financial Officer)
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Business Development Manager
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Project Manager
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Head of Procurement
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: HR Director
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: HR Director
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Production manager
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Marketing manager
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: COO (Chief Operating Officer)
  • Phone: Blurred
  • Corporate email: Blurred

Subscribe to Latin America’s most trusted business intelligence platform.

Other projects in: Mining & Metals (Chile)

Get critical information about thousands of Mining & Metals projects in Latin America: what stages they're in, capex, related companies, contacts and more.

  • Project: Aguilucho
  • Current stage: Blurred
  • Updated: 4 weeks ago
  • Project: Placeton
  • Current stage: Blurred
  • Updated: 1 month ago
  • Project: Gorbea
  • Current stage: Blurred
  • Updated: 1 month ago
  • Project: Altazor
  • Current stage: Blurred
  • Updated: 1 month ago
  • Project: Nord
  • Current stage: Blurred
  • Updated: 1 month ago
  • Project: Rubí
  • Current stage: Blurred
  • Updated: 1 month ago
  • Project: Zeus
  • Current stage: Blurred
  • Updated: 1 month ago

Other companies in: Mining & Metals (Chile)

Get critical information about thousands of Mining & Metals companies in Latin America: their projects, contacts, shareholders, related news and more.

  • Company: Eaton Industries Chile SpA  (Eaton Chile)
  • The description contained in this profile was taken directly from an official source and has not been edited or modified by BNamericas researchers, but may have been automatical...
  • Company: JRI Ingeniería S.A.  (JRI Ingeniería)
  • The description included in this profile was taken directly from an official source and has not been modified or edited by the BNamericas’ researchers. However, it may have been...
  • Company: Minera El Morado SpA  (Minera El Morado)
  • The description contained in this profile was taken directly from an official source and has not been edited or modified by BNamericas researchers, but may have been automatical...

Project information

Full name
7 Pad Hydraulic Fracturing In Arenal Block
Project Status
Active
Type of Ownership
Private
Project Type
Blurred
Capex
Blurred