Projects

Alto Biavo hydro plant

Get all the information on the Alto Biavo hydro plant, a Electric Power project. Connect with the contracted companies and their key contacts, track the project stage and milestones, read related news and more. Some issues around this topic are: Substations and Run of the river. Write to us at info@bnamericas.com or call us at +56 (2) 29410300 to schedule a demonstration of our platform.

Description: The project consists of the construction of a run-of-the-river hydroelectric plant, which would use the waters of the Biavo River, known locally as Cacha Tigre, at an approximate elevation of 706 m.a.s.l. The design flow of the plant is 100m3/s, the gross head is 367m. It will have the possibility of daily regulation of the flow to be able to guarantee the availability of firm energy throughout the year. A 14m bar will be installed to keep the water mirror sufficient for daily regulation and to avoid excessive entry of sediment into the adduction system. Once turbined, the water will be returned to the Biavo river through the discharge channel at an elevation of approximately 340 meters above sea level. The plant will have four francis vertical turbines. The electricity generated of approximately 2,119 GWh will be dispatched through the project's substation, which will be installed near the powerhouse, and a transmission line to the National Interconnected Electric System (SEIN) of Peru. The construction stage will require about 1,000 people, of which 800 will correspond to qualified labor. For the operation phase, 18 people will be required. The project is located on the right bank of the Biavo River, in the Alto Biavo district, Bellavista province, San Martín region.

Subscribe to the leading business intelligence platform in Latin America with different tools for Providers, Contractors, Operators, Government, Legal, Financial and Insurance industries.

Related companies

Get valuable information on companies involved in the Alto Biavo hydro plant.

  • Related companies Blurred
  • Role: Owner
  • Related companies Blurred
  • Role: Concessionaire/Operator
  • Related companies Blurred
  • Role: Constructor

Key contacts

Obtain contact information on key people working at the Alto Biavo hydro plant.

  • Name Blurred
  • Position: CEO (Chief Executive Officer)
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: CFO (Chief Financial Officer)
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Business Development Manager
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Project Manager
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Head of Procurement
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: HR Director
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: HR Director
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Production manager
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Marketing manager
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: COO (Chief Operating Officer)
  • Phone: Blurred
  • Corporate email: Blurred

Subscribe to Latin America’s most trusted business intelligence platform.

Other projects in: Electric Power

Get critical information about thousands of Electric Power projects in Latin America: what stages they're in, capex, related companies, contacts and more.

Other companies in: Electric Power

Get critical information about thousands of Electric Power companies in Latin America: their projects, contacts, shareholders, related news and more.

  • Company: Consorcio CCC Ituango
  • Consorcio CCC is a consortium led by Brazilian infrastructure firm Construções e Comércio Camargo Corrêa, which holds a 55% stake of the company, along with the Colombian Constr...
  • Company: Fénix Power Perú S.A.  (Fénix)
  • Fénix Power Perú is the owner and operator of the Fénix thermoelectric plant located in the district of Chilca, in Peru's Lima department. The facility includes two natural gas-...
  • Company: General Electric Co.  (GE)
  • General Electric Co. (GE) is a US company engaged in the development, manufacture and marketing of various products for the generation, transmission, distribution, control and u...
  • Company: Anddes Asociados S.A.C.  (Anddes)
  • Anddes is a Peruvian company that provides advisory and consulting services in the areas of development and supervision of environmental projects, engineering and construction f...
  • Company: GPMS GmbH
  • The description included in this profile was taken directly from an official source and has not been modified or edited by the BNamericas’ researchers. However, it may have been...
  • Company: Jorge Briones Ingeniería S.A.  (JOBRISA)
  • La descripción contenida en este perfil fue extraída directamente desde una fuente oficial y no ha sido editada ni modificada por los investigadores de BNamericas, pero puede ha...
  • Company: Secretaría Nacional de Energía Panamá
  • The Secretaría Nacional de Energía (SNE) is the department of energy of Panama which is in charge of establishing and promoting the national plan on energy, electricity and hydr...

Project information

Full name
Alto Biavo hydro plant
Project Status
Active
Type of Ownership
Private
Project Type
Blurred
Capex
Blurred