Chile
Projects

Cabrero Solar Photovoltaic Park

Electric Power project in Chile, currently in the stage of Blurred

Get all the information on the Cabrero Solar Photovoltaic Park, a Electric Power project. Connect with the contracted companies and their key contacts, track the project stage and milestones, read related news and more. Some issues around this topic are: Photovoltaic. Write to us at info@bnamericas.com or call us at +56 (2) 29410300 to schedule a demonstration of our platform.

Description: CABRERO SOLAR PHOTOVOLTAIC PARK Power generation plants greater than 3 MW The “Cabrero Solar” Project corresponds to a new photovoltaic park located 1.2 km to the south west of the city of Cabrero, in the commune of Cabrero, in the Region of Bio Bio. The project will generate clean energy through the construction of a 9 MW AC power plant, which is why it is considered as a small means of distributed generation (PMGD) based on non-conventional renewable energies (NCRE). The photovoltaic park will consist of approximately 40,000 panels, installed with single-axis tracker technology. Considers the construction of a 23 kV power line (“Interconnection Line”), approximately 770 meters long, to transmit the energy produced to the National Electric System (SEN), connecting to an existing feeder of the same voltage, owned by the local distribution company. The project contemplates the use of an approximate surface of 25 hectares, considering the total of its facilities. It should be noted that the Project will leave the creek areas that cross the property free. It will have a useful life of 25 years and the access to the Project will be from Route 146 (former route Q-50), towards the east at approximately kilometer 4.2. The objective of the “Cabrero Solar” Project is the generation of electrical energy from solar energy, through a photovoltaic park whose maximum power to be injected into the distribution network is 9 MW AC. The project will use the renewable resources that the Bio Bío Region presents for the production of clean and non-polluting energy during its entire operation phase, for which it is framed in the context of Non-Conventional Renewable Energies (NCRE). In recent years, energy demand has been growing throughout the world and in our country as well, both at a communal and regional level. Additionally, climate change and concern for the environment have generated the search for sustainable alternatives for energy generation. Therefore, this type of project contributes to the development of a diverse energy matrix for the country, delivering clean energy to the local distribution network and the National Electric System (SEN), since they do not generate polluting emissions during their operation, as They are PM10 and PM2.5 and gases into the atmosphere such as Sulphur, CO2, CO, Lead, etc.

Subscribe to the leading business intelligence platform in Latin America with different tools for Providers, Contractors, Operators, Government, Legal, Financial and Insurance industries.

Related companies

Get valuable information on companies involved in the Cabrero Solar Photovoltaic Park.

  • Related companies Blurred
  • Role: Owner
  • Related companies Blurred
  • Role: Concessionaire/Operator
  • Related companies Blurred
  • Role: Constructor

Key contacts

Obtain contact information on key people working at the Cabrero Solar Photovoltaic Park.

  • Name Blurred
  • Position: CEO (Chief Executive Officer)
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: CFO (Chief Financial Officer)
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Business Development Manager
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Project Manager
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Head of Procurement
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: HR Director
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: HR Director
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Production manager
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Marketing manager
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: COO (Chief Operating Officer)
  • Phone: Blurred
  • Corporate email: Blurred

Subscribe to Latin America’s most trusted business intelligence platform.

Other projects in: Electric Power (Chile)

Get critical information about thousands of Electric Power projects in Latin America: what stages they're in, capex, related companies, contacts and more.

Other companies in: Electric Power (Chile)

Get critical information about thousands of Electric Power companies in Latin America: their projects, contacts, shareholders, related news and more.

  • Company: Eaton Industries Chile SpA  (Eaton Chile)
  • The description contained in this profile was taken directly from an official source and has not been edited or modified by BNamericas researchers, but may have been automatical...
  • Company: ISA Interchile S.A.  (Interchile)
  • Interchile S.A., a Chilean subsidiary of Colombia's state transmission group ISA, is engaged in the development of transmission line projects. One of its major initiatives in th...
  • Company: Energía Eólica Curauma SpA
  • The description included in this profile was taken directly from an AI source and has not been edited or modified by BNamericas researchers. However, it may have been automatica...
  • Company: Solar de Domeyko SpA  (Solar de Domeyko)
  • The description included in this profile was taken directly from an AI source and has not been edited or modified by BNamericas researchers. However, it may have been automatica...

Project information

Full name
Cabrero Solar Photovoltaic Park
Project Status
Active
Type of Ownership
Private
Project Type
Blurred
Capex
Blurred