Chile
Project Profile

El Membrillo Solar Energy

Electric Power project in Chile, currently in the stage of Blurred

Get all the information on the El Membrillo Solar Energy, a Electric Power project. Connect with the contracted companies and their key contacts, track the project stage and milestones, read related news and more. Some issues around this topic are: Photovoltaic. Write to us at info@bnamericas.com or call us at +56 (2) 29410300 to schedule a demonstration of our platform.

Description: The “Energética Solar El Membrillo” Project corresponds to a new Solar Photovoltaic Power Plant (CSF) that will be located in the Metropolitan Region, province of Melipilla, commune of San Pedro. This Project will generate clean energy through the construction of a Solar Plant that considers the installation of 13,860 photovoltaic modules or panels, which corresponds to an installed power of 9 MW in alternating current (AC). In addition to the above, the Project will have an energy storage system using BESS batteries (Battery Energy Storage System) so that the energy generated can be injected, on a deferred basis, into the National Electric System (SEN). . In this sense, the Project considers an integrated system of photovoltaic panels and energy storage. For the evacuation of the generated energy, the Project considers the construction of a 23 kV power line (medium voltage line), which will be connected to the “El Membrillo” feeder. It should be noted that from the feeder connection point "El Membrillo" to the "Santa Rosa" substation, an existing station will be used to transmit the energy produced to the National Electric System (SEN). The Project will be developed on an area of approximately 17.13 hectares, while the medium voltage line will have a length of approximately 75.83 m. The Project will be accessed from Route G-680, to the CSF access point. Regarding the operation and surveillance of the Plant, it is clarified that this will be carried out remotely and in real time, also having a Video Surveillance System in the Plant. In the solar field, only maintenance activities, panel cleaning and equipment inspection will be carried out, which will be carried out on a scheduled basis every 6 months. The Project considers a duration of the Operation Phase of 35 years, which may be extended because the operation (or operation) of the solar plant will depend on technological improvements that allow the equipment to be changed to the extent that market conditions justify the investment. . The objective of the Project is the generation of electrical energy from solar radiation, supplying its generated energy to the existing distribution network, promoting decarbonization, advancing the sustainability of the energy sector and allowing participation in potential opportunities.

Subscribe to the leading business intelligence platform in Latin America with different tools for Providers, Contractors, Operators, Government, Legal, Financial and Insurance industries.

Related companies

Get valuable information on companies involved in the El Membrillo Solar Energy.

  • Related companies Blurred
  • Role: Owner
  • Related companies Blurred
  • Role: Concessionaire/Operator
  • Related companies Blurred
  • Role: Constructor

Key contacts

Obtain contact information on key people working at the El Membrillo Solar Energy.

  • Name Blurred
  • Position: CEO (Chief Executive Officer)
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: CFO (Chief Financial Officer)
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Business Development Manager
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Project Manager
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Head of Procurement
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: HR Director
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: HR Director
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Production manager
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Marketing manager
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: COO (Chief Operating Officer)
  • Phone: Blurred
  • Corporate email: Blurred

Subscribe to Latin America’s most trusted business intelligence platform.

Other projects in: Electric Power (Chile)

Get critical information about thousands of Electric Power projects in Latin America: what stages they're in, capex, related companies, contacts and more.

Other companies in: Electric Power (Chile)

Get critical information about thousands of Electric Power companies in Latin America: their projects, contacts, shareholders, related news and more.

Project information

Full name
El Membrillo Solar Energy
Project Status
Active
Type of Ownership
Private
Project Type
Blurred
Capex
Blurred