Project Profile

Energy Storage System and Transmission Line BESS Tambillo

Get all the information on the Energy Storage System and Transmission Line BESS Tambillo, a Electric Power project. Connect with the contracted companies and their key contacts, track the project stage and milestones, read related news and more. Some issues around this topic are: SubstationsTransmissionEnergy Storage and Transmission Lines. Write to us at info@bnamericas.com or call us at +56 (2) 29410300 to schedule a demonstration of our platform.

Description: The project involves the construction and operation of an energy storage system using lithium-ion battery technology, associated with the construction of a high-voltage electrical evacuation line and a step-up substation to be called the BESS Tambillo substation, on a 10ha site in the commune of Pozo Almonte, Tarapacá region, Chile. The initiative will be connected to the National Electric System at the Nueva Pozo Almonte substation, through the laying of a transmission line and the existing Nueva Pozo Almonte – Parinacota line. For the construction phase, which will last 12 months, an average of 125 workers is considered and a maximum of 200 during the period of maximum demand for labor.

Subscribe to the leading business intelligence platform in Latin America with different tools for Providers, Contractors, Operators, Government, Legal, Financial and Insurance industries.

Related companies

Get valuable information on companies involved in the Energy Storage System and Transmission Line BESS Tambillo.

  • Related companies Blurred
  • Role: Owner
  • Related companies Blurred
  • Role: Concessionaire/Operator
  • Related companies Blurred
  • Role: Constructor

Key contacts

Obtain contact information on key people working at the Energy Storage System and Transmission Line BESS Tambillo.

  • Name Blurred
  • Position: CEO (Chief Executive Officer)
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: CFO (Chief Financial Officer)
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Business Development Manager
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Project Manager
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Head of Procurement
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: HR Director
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: HR Director
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Production manager
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Marketing manager
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: COO (Chief Operating Officer)
  • Phone: Blurred
  • Corporate email: Blurred

Subscribe to Latin America’s most trusted business intelligence platform.

Other projects in: Electric Power

Get critical information about thousands of Electric Power projects in Latin America: what stages they're in, capex, related companies, contacts and more.

Other companies in: Electric Power

Get critical information about thousands of Electric Power companies in Latin America: their projects, contacts, shareholders, related news and more.

  • Company: Nordex Chile S.p.A.  (Nordex Acciona Chile)
  • Nordex Chile SpA is the local subsidiary of Germany's Nordex SE, a holding company part of the global wind power turbine manufacturer group formed by Nordex and Spain's Acciona ...
  • Company: Gás Natural Açu Ltda.  (GNA)
  • Gás Natural Açu Ltda. (GNA), founded in 2010 and headquartered in Rio de Janeiro, is a Brazilian company aimed at LNG storage and production which operates as a subsidiary of th...
  • Company: Siemens Gamesa Latam
  • The description included in this profile was taken directly from an AI source and has not been edited or modified by BNamericas researchers. However, it may have been automatica...
  • Company: Entidad Binacional Yacyretá  (EBY)
  • Entidad Binacional Yacyretá (EBY) is a binational JV that operates the Yacyretá hydroelectric dam on the Argentina-Paraguay border. The power station has a total installed capac...
  • Company: Andes Mainstream SpA  (Andes Mainstream)
  • Andes Mainstream S.p.A. is a Chile-based renewable energy company and a subsidiary of Ireland's Mainstream Renewable Power. The company has a development portfolio that exceeds ...
  • Company: Inelectra, S.A.C.A.  (Inelectra)
  • Inelectra is an engineering, procurement and construction company founded in 1968. The company has the experience, execution capacity and talent to undertake projects in the inf...
  • Company: Grupo Isastur  (Isastur)
  • Isastur is a Spanish group of companies specializing in the development of infrastructure related to the energy sector. Founded in 1978, the company is headquartered in Asturias...

Project information

Full name
Energy Storage System and Transmission Line BESS Tambillo
Project Status
Active
Type of Ownership
Private
Project Type
Blurred
Capex
Blurred