Get all the information on the Hidroriente Hydroelectric Project with its 230kV Transmission Line and Accesses, a Water & Waste and Electric Power project. Connect with the contracted companies and their key contacts, track the project stage and milestones, read related news and more. Some issues around this topic are: SubstationsTransmission Lines and Hydro Dam. Write to us at info@bnamericas.com or call us at +56 (2) 29410300 to schedule a demonstration of our platform.

Description: The project includes the construction, operation, maintenance, closure, and abandonment of a hydroelectric dam that will be built on an area of approximately 158ha and that will capture the waters of the Machinaza River in the provinces of Zamora Chinchipe and Morona Santiago, cantons: El Pangui and Gualaquiza, parishes: Bomboiza, El Guisme, El Pangui, Pachicutza and Tundayme. The energy generated will be supplied privately; however, any energy surpluses produced will be sent to the National Electric System. The energy generated will be transported through a transmission line from the new Hidroriente substation to the existing Bomboiza substation, owned by a third party. The construction of the project will be carried out, depending on technological and market availability, with electrically powered machinery instead of fuel-powered machinery, through a medium-voltage power line connected to the sector's distribution network that will reach each work front in order to avoid the permanent use of generators. The generators will only be used as a backup in case of emergency.

Subscribe to the leading business intelligence platform in Latin America with different tools for Providers, Contractors, Operators, Government, Legal, Financial and Insurance industries.

Related companies

Get valuable information on companies involved in the Hidroriente Hydroelectric Project with its 230kV Transmission Line and Accesses.

  • Related companies Blurred
  • Role: Owner
  • Related companies Blurred
  • Role: Concessionaire/Operator
  • Related companies Blurred
  • Role: Constructor

Key contacts

Obtain contact information on key people working at the Hidroriente Hydroelectric Project with its 230kV Transmission Line and Accesses.

  • Name Blurred
  • Position: CEO (Chief Executive Officer)
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: CFO (Chief Financial Officer)
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Business Development Manager
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Project Manager
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Head of Procurement
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: HR Director
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: HR Director
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Production manager
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Marketing manager
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: COO (Chief Operating Officer)
  • Phone: Blurred
  • Corporate email: Blurred

Subscribe to Latin America’s most trusted business intelligence platform.

Other projects in: Water & Waste

Get critical information about thousands of Water & Waste projects in Latin America: what stages they're in, capex, related companies, contacts and more.

Other companies in: Water & Waste

Get critical information about thousands of Water & Waste companies in Latin America: their projects, contacts, shareholders, related news and more.

  • Company: National Water Commission  (NWC Jamaica)
  • Jamaica's National Water Commission (NWC) is a government agency charged with providing potable water and wastewater treatment services. Its projects include the Santa Cruz wate...
  • Company: Mascarenhas Barbosa Roscoe S.A. Construções
  • The description contained in this profile was taken directly from an official source and has not been edited or modified by BNamericas researchers, but may have been automatical...
  • Company: Fast Indústria e Comércio Ltda.  (Fast)
  • The description contained in this profile was taken directly from an official source and has not been edited or modified by BNamericas researchers, but may have been machine tra...

Project information

Full name
Hidroriente Hydroelectric Project with its 230kV Transmission Line and Accesses
Project Status
Active
Type of Ownership
Private
Project Type
Blurred