Chile
Project Profile

Hydraulic Fracturing Pad North Shack Zg1 And Pad Tip Stone Zgc

Oil & Gas project in Chile, currently in the stage of Blurred

Get all the information on the Hydraulic Fracturing Pad North Shack Zg1 And Pad Tip Stone Zgc, a Electric Power and Oil & Gas project. Connect with the contracted companies and their key contacts, track the project stage and milestones, read related news and more. Some issues around this topic are: Oil sandsBrentNYMEX Light Sweet CrudeShallow watersSubseaShale gas Geological mapping / SurveysTight gasType of extractionWTIShale OilOffshoreType of hydrocarbonsCoalbed methaneDeepwaterUpstreamUnconventionalsMexican MixLocationDrilling rigsOnshoreNatural GasConventionalsCrude oil and Heavy oil. Write to us at info@bnamericas.com or call us at +56 (2) 29410300 to schedule a demonstration of our platform.

Description: The present Project consists of carrying out the process of "hydraulic fracturing" to the PAD Cabaña Norte ZG1 and Punta Piedra ZGC of the Arenal Block, with six wells (6) each ironed or PAD. For the purpose of the above, it is also considered the installation of 2 flow stations, which will be located inside the respective ironing. The fracturing process consists of a technique of stimulation of the well, through the sustained injection of a fluid at such a pressure, that causes the rupture of the rock of the deposit (increase of the contact area of the reservoir with the well), with the purpose of creating new channels or connecting existing flow channels, increasing the flow rate of the well and thereby its productivity. The objective of Production is the extraction of hydrocarbons confined in the Glauconitic Formation, whose existence has been demonstrated by previous studies. This formation is located at an approximate depth between 1,500 and 3,000 meters below the mean sea level and will be accessed through the hydraulic fracture of 2 PAD in the Arenal Block. The permeability of the rock in conventional hydrocarbon reservoirs (as in the case of Springhill in Magallanes), is from 5 to 1,500 millidarcy approximately, however, in non-conventional reservoirs, the permeability of the rock fluctuates between 0.001 to 0.04 milidarcy . Due to the low permeability, it is necessary to perform the fracture operation, without which extraction of the confined hydrocarbons would not be possible. Regarding the drilling process of the PADs associated to the present project (6 wells to be fractured by PAD), they were environmentally qualified through the Environmental Qualification Resolution (RCA) No. 047/2018, corresponding to the "Generic Sub-Arenal Blocks" project. It should be mentioned that, currently, none of the wells that are part of this project is drilled, however, in each PAD there is already a well drilled and fractured with its respective RCA for both drilling and fracture. Objective The Project seeks to increase the productivity of 2 PAD hydrocarbons located within the Arenal block, through the process of hydraulic fracturing in the Glauconitic Formation, a process that will increase the area of contact of the reservoir with the vicinity of the wells, thereby achieving the extraction of the hydrocarbons contained in the deposit at profitable flows.

Subscribe to the leading business intelligence platform in Latin America with different tools for Providers, Contractors, Operators, Government, Legal, Financial and Insurance industries.

Related companies

Get valuable information on companies involved in the Hydraulic Fracturing Pad North Shack Zg1 And Pad Tip Stone Zgc.

  • Related companies Blurred
  • Role: Owner
  • Related companies Blurred
  • Role: Concessionaire/Operator
  • Related companies Blurred
  • Role: Constructor

Key contacts

Obtain contact information on key people working at the Hydraulic Fracturing Pad North Shack Zg1 And Pad Tip Stone Zgc.

  • Name Blurred
  • Position: CEO (Chief Executive Officer)
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: CFO (Chief Financial Officer)
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Business Development Manager
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Project Manager
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Head of Procurement
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: HR Director
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: HR Director
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Production manager
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Marketing manager
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: COO (Chief Operating Officer)
  • Phone: Blurred
  • Corporate email: Blurred

Subscribe to Latin America’s most trusted business intelligence platform.

Other projects in: Oil & Gas (Chile)

Get critical information about thousands of Oil & Gas projects in Latin America: what stages they're in, capex, related companies, contacts and more.

Other companies in: Oil & Gas (Chile)

Get critical information about thousands of Oil & Gas companies in Latin America: their projects, contacts, shareholders, related news and more.

  • Company: KSB Chile S.A.
  • The Chilean subsidiary of KSB, manufacturer and distributor of industrial pumps and valves, was established in 1994. It has seven branches throughout the country (Iquique, Antof...
  • Company: AGRU Chile
  • AGRU Chile is the Chilean subsidiary of AGRU, an Austrian company with more than 70 years of experience in the engineering and manufacturing of thermoplastics and geosynthetics.

Project information

Full name
Hydraulic Fracturing Pad North Shack Zg1 And Pad Tip Stone Zgc
Project Status
Active
Project Type
Blurred
Capex
Blurred