Get all the information on the Hydraulic Fracturing Pad North Shack Zg1 And Pad Tip Stone Zgc, a Oil & Gas and Electric Power project. Connect with the contracted companies and their key contacts, track the project stage and milestones, read related news and more. Some issues around this topic are: Crude oil, Natural Gas, Onshore, Heavy oil, Unconventionals, Tight gas, Type of extraction, Mexican Mix, Type of hydrocarbons, Brent, Conventionals, Oil sands, Geological mapping / Surveys, Subsea, Shale Oil, Shale gas , WTI, NYMEX Light Sweet Crude, Deepwater, Coalbed methane, Location, Upstream, Shallow waters, Drilling rigs and Offshore. Write to us at info@bnamericas.com or call us at +56 (2) 29410300 to schedule a demonstration of our platform.
Description: The present Project consists of carrying out the process of "hydraulic fracturing" to the PAD Cabaña Norte ZG1 and Punta Piedra ZGC of the Arenal Block, with six wells (6) each ironed or PAD. For the purpose of the above, it is also considered the installation of 2 flow stations, which will be located inside the respective ironing. The fracturing process consists of a technique of stimulation of the well, through the sustained injection of a fluid at such a pressure, that causes the rupture of the rock of the deposit (increase of the contact area of the reservoir with the well), with the purpose of creating new channels or connecting existing flow channels, increasing the flow rate of the well and thereby its productivity. The objective of Production is the extraction of hydrocarbons confined in the Glauconitic Formation, whose existence has been demonstrated by previous studies. This formation is located at an approximate depth between 1,500 and 3,000 meters below the mean sea level and will be accessed through the hydraulic fracture of 2 PAD in the Arenal Block. The permeability of the rock in conventional hydrocarbon reservoirs (as in the case of Springhill in Magallanes), is from 5 to 1,500 millidarcy approximately, however, in non-conventional reservoirs, the permeability of the rock fluctuates between 0.001 to 0.04 milidarcy . Due to the low permeability, it is necessary to perform the fracture operation, without which extraction of the confined hydrocarbons would not be possible. Regarding the drilling process of the PADs associated to the present project (6 wells to be fractured by PAD), they were environmentally qualified through the Environmental Qualification Resolution (RCA) No. 047/2018, corresponding to the "Generic Sub-Arenal Blocks" project. It should be mentioned that, currently, none of the wells that are part of this project is drilled, however, in each PAD there is already a well drilled and fractured with its respective RCA for both drilling and fracture. Objective The Project seeks to increase the productivity of 2 PAD hydrocarbons located within the Arenal block, through the process of hydraulic fracturing in the Glauconitic Formation, a process that will increase the area of contact of the reservoir with the vicinity of the wells, thereby achieving the extraction of the hydrocarbons contained in the deposit at profitable flows.
Subscribe to the leading business intelligence platform in Latin America with different tools for Providers, Contractors, Operators, Government, Legal, Financial and Insurance industries.
Related companies
Get valuable information on companies involved in the Hydraulic Fracturing Pad North Shack Zg1 And Pad Tip Stone Zgc.
- Related companies
- Role: Owner
- Related companies
- Role: Concessionaire/Operator
- Related companies
- Role: Constructor
Key contacts
Obtain contact information on key people working at the Hydraulic Fracturing Pad North Shack Zg1 And Pad Tip Stone Zgc.
- Name
- Position: CEO (Chief Executive Officer)
- Phone:
- Corporate email:
- Name
- Position: CFO (Chief Financial Officer)
- Phone:
- Corporate email:
- Name
- Position: Business Development Manager
- Phone:
- Corporate email:
- Name
- Position: Project Manager
- Phone:
- Corporate email:
- Name
- Position: Head of Procurement
- Phone:
- Corporate email:
- Name
- Position: HR Director
- Phone:
- Corporate email:
- Name
- Position: HR Director
- Phone:
- Corporate email:
- Name
- Position: Production manager
- Phone:
- Corporate email:
- Name
- Position: Marketing manager
- Phone:
- Corporate email:
- Name
- Position: COO (Chief Operating Officer)
- Phone:
- Corporate email:
Subscribe to Latin America’s most trusted business intelligence platform.
Other projects in: Electric Power (Chile)
Get critical information about thousands of Electric Power projects in Latin America: what stages they're in, capex, related companies, contacts and more.
- Project: ENAPAC
- Current stage:
- Updated:
4 days ago
- Project: Illapa thermo plant
- Current stage:
- Updated:
4 days ago
- Project: Arica - Tacna Transmission Line (Parinacota Substation - Los Héroes Substation)
- Current stage:
- Updated:
4 days ago
- Project: ENAPAC East Distribution
- Current stage:
- Updated:
4 days ago
- Project: Energy and water of the Pacific (ENAPAC)
- Current stage:
- Updated:
5 days ago
- Project: Sol de Caone photovoltaic park
- Current stage:
- Updated:
5 days ago
- Project: Tirana Oeste photovoltaic park
- Current stage:
- Updated:
5 days ago
- Project: Lena BESS plant and transmission line
- Current stage:
- Updated:
5 days ago
- Project: Alba Project
- Current stage:
- Updated:
6 days ago
- Project: Cigüeña photovoltaic park
- Current stage:
- Updated:
1 week ago
Other companies in: Electric Power (Chile)
Get critical information about thousands of Electric Power companies in Latin America: their projects, contacts, shareholders, related news and more.
- Company: PFV Chirihue SpA  (PFV Chirihue)
- Company: FRV Services Chile SpA  (FRV Services Chile)
-
The description included in this profile was taken directly from an AI source and has not been edited or modified by BNamericas researchers. However, it may have been automatica...
- Company: Gestiona Consultores SpA
- Company: Oenergy SpA  (Oenergy)
-
The description contained in this profile was taken directly from an official source and has not been edited or modified by BNamericas researchers, but may have been automatical...
- Company: Sonnedix Chile Holding SpA  (Sonnedix)
-
Sonnedix Chile Holding Spa ., a 50:50 JV between independent solar power producer Sonnedix and IIF Solar Investment Ltd, develops, builds, owns and operates solar power plants g...
- Company: INNA Soluciones Renovables SpA
News in: Electric Power (Chile)
Southern Cone roundup: US$400mn lithium mining transmission line, US$350mn power projects, subsidy bill
Electric power news from Argentina, Uruguay and Chile.
Electricity rate hikes spark debate on efficiency and energy savings
In some areas such as Coquimbo and Copiapó, electricity bills will see significant increases of up to 25.4%, while in Santiago, Enel Distribución c...