Chile
Project Profile

New Sectioning Substation Cerros de Huichahue

Electric Power project in Chile, currently in the stage of Blurred

Get all the information on the New Sectioning Substation Cerros de Huichahue, a Electric Power project. Connect with the contracted companies and their key contacts, track the project stage and milestones, read related news and more. Some issues around this topic are: Security and Substations. Write to us at info@bnamericas.com or call us at +56 (2) 29410300 to schedule a demonstration of our platform.

Description: The Project consists of the complete construction of a new substation, called "New Substation of Cerros de Huichahue", whose main purpose will be to section the 2X220 Ciruelos-Pichirropulli Line. The Project includes the construction of: a new substation in a switch configuration and an isolated medium in air (AIS), two diagonals for the sectioning and the enabling of additional space for two bar diagonals for future potential generation projects in the area, activities that do not correspond to this Project and will be evaluated by third parties when appropriate. The Project also includes the platform, urbanization, closures, roads, grounding grid, construction of a new general services house, construction of the main bars, the incorporation of a control, protection and telecommunications system, incorporation of a system of surveillance, lighting system, incorporation of a differential protection of bars, among others. In addition, the Project includes four sectioning structures for the existing 2x220 Ciruelos-Pichirropulli line, between existing structures 116 and 117: two of them will be located within the Line's security strip, so they will be located in an area currently intervened and cleared according to the successive maintenance of the same, while the other two structures will be located within the cloth considered for the Project. Likewise, the Project includes a fire wall as a preventive measure consisting of a buffer area for the electrical installations of the substation and two of the sectioning structures considered. This firewall will allow a distance of 20 m between the equipment and the surrounding vegetation, in order to provide protection against forest fires. To execute the works of the Project it will be necessary to count on the support of two temporary works, this is a work site and mobile fronts, works that will be demobilized once the construction phase is concluded. Objective The Project is part of the Expansion Plan of the Trunk Transmission System decreed by the Ministry of Energy, as stated in Exempt Decree No. 422 of August 18, 2017 (attached in Annex 1-2). Decree in which various works of modifications to the trunk system are indicated, necessary for its operation. The Project responds to the need to improve the reliability of the existing 2x220 Ciruelos-Pichirropulli line, also allowing the connection of new sources of generation or distribution of energy.

Subscribe to the leading business intelligence platform in Latin America with different tools for Providers, Contractors, Operators, Government, Legal, Financial and Insurance industries.

Related companies

Get valuable information on companies involved in the New Sectioning Substation Cerros de Huichahue.

  • Related companies Blurred
  • Role: Owner
  • Related companies Blurred
  • Role: Concessionaire/Operator
  • Related companies Blurred
  • Role: Constructor

Key contacts

Obtain contact information on key people working at the New Sectioning Substation Cerros de Huichahue.

  • Name Blurred
  • Position: CEO (Chief Executive Officer)
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: CFO (Chief Financial Officer)
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Business Development Manager
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Project Manager
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Head of Procurement
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: HR Director
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: HR Director
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Production manager
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Marketing manager
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: COO (Chief Operating Officer)
  • Phone: Blurred
  • Corporate email: Blurred

Subscribe to Latin America’s most trusted business intelligence platform.

Other projects in: Electric Power (Chile)

Get critical information about thousands of Electric Power projects in Latin America: what stages they're in, capex, related companies, contacts and more.

Other companies in: Electric Power (Chile)

Get critical information about thousands of Electric Power companies in Latin America: their projects, contacts, shareholders, related news and more.

  • Company: GeoPark Ltd.  (GeoPark)
  • Founded in 2002, GeoPark Ltd. is a Latin America-focused oil and gas explorer and operator with operations in Chile, Colombia, Brazil and, on a smaller scale, Argentina. The com...
  • Company: TEG Chile SpA  (TEG Chile)
  • The description included in this profile was taken directly from an official source and has not been modified or edited by the BNamericas’ researchers. However, it may have been...
  • Company: Enel Green Power Chile
  • Enel Green Power Chile Ltda., formerly Enel Latin America Chile Ltda., is the local unit of Italian multinational Enel Green Power S.p.A. It is engaged in the construction and o...
  • Company: GR Power Chile SpA  (GR Power Chile)
  • The description contained in this profile was taken directly from an official source and has not been edited or modified by BNamericas researchers, but may have been automatical...

Project information

Full name
New Sectioning Substation Cerros de Huichahue
Project Status
Active
Type of Ownership
Private
Project Type
Blurred
Capex
Blurred