Project Profile

New Wastewater Treatment Plant (PTAS) for reuse in Antofagasta

Get all the information on the New Wastewater Treatment Plant (PTAS) for reuse in Antofagasta, a Water & Waste project. Connect with the contracted companies and their key contacts, track the project stage and milestones, read related news and more. Some issues around this topic are: Wastewater treatment plants and Water pipelines. Write to us at info@bnamericas.com or call us at +56 (2) 29410300 to schedule a demonstration of our platform.

Description: The plant will be built in three modules, capable of treating 300 L/s each, that is, with a total treatment capacity of 900 L/s. Each treatment module will have two biological reactors with a treatment capacity of 150 L/s each, which will be aerated through pumps that will drive air to the bubble diffuser grills. These will be mixed with the water by means of mechanical agitation. It will be built in three sub-phases: Sub-Phase 1 : involves the works and actions necessary to deliver the first 300 L/s to the industrial sector. Installation of pre-treated sewage conduction from the current location of the current pre-treatment system to the 2,000 m3 accumulation tank, located in the Salar el Carmen sector. Construction of 4 pre-treated Sewage Elevation Plants (PEAS) necessary for the conduction of this type of water. Construction of Module 1 of the PTAS that will allow treating a flow of 300 L/s, incorporating all the annexed elements necessary for the operation of the plant, such as complete internal roads, internal lifting and treated water plants, administrative offices, electrical backups enter others. Treated Water Lifting Plant to drive the treated water from the PTAS to the 2,000 m3 treated water storage tank. This will be located next to the PTAS and will allow, from this point, to distribute the treated water to the La Negra sector. Booster Elevator Plant for delivery to the La Negra sector, with a total installed capacity of 450 L/s, to be located next to the PTAS. Conduction of Treated Water to the La Negra sector, where the 800 mm HDPE or 762 mm or 457 mm steel pipes will be installed, as appropriate. Sub-Phase 2 : involves the works and actions necessary to deliver the second 300 L/s to the industrial sector, thus completing a total of 600 L/s after the construction of this sub-phase. This sub-phase includes the following: Construction of Module 2 of the PTAS that will allow treating a flow of 300 L/s, thus achieving an installed treatment capacity of 600 L/s. Mantos Blancos Elevator Plant 1 for delivery to the Mantos Blancos sector, with a total installed capacity of 450 L/s, to be located next to the PTAS and PE Booster. Mantos Blancos 2 Lifting Plant to continue with the drive to the Mantos Blancos sector, with a total installed capacity of 450 L/s. In said lifting plant, all the elements necessary for the operation of said pumping stations will be incorporated, including the annexed elements such as accumulation tanks of 1,620 m3, hydropneumatic elements, backup generators, among others. Conduction of Treated Water to the Mantos Blancos sector, where the 800 mm HDPE or 711 mm steel pipes will be sunk, as appropriate, mainly through the fiscal road belt of Route 5 North. Final tank for the accumulation of treated water, which will be located at the end of the route to Mantos Blancos and will have a capacity of 2,000 m3. Sub-Phase 3 : involves the works and actions necessary to deliver the last 300 L/s to the industrial sector contemplated by this project under evaluation, thus completing, after construction, a treatment capacity of 900 L/s. Construction of Module 3 of the Wastewater Treatment Plant (PTAS).

Subscribe to the leading business intelligence platform in Latin America with different tools for Providers, Contractors, Operators, Government, Legal, Financial and Insurance industries.

Related companies

Get valuable information on companies involved in the New Wastewater Treatment Plant (PTAS) for reuse in Antofagasta.

  • Related companies Blurred
  • Role: Owner
  • Related companies Blurred
  • Role: Concessionaire/Operator
  • Related companies Blurred
  • Role: Constructor

Key contacts

Obtain contact information on key people working at the New Wastewater Treatment Plant (PTAS) for reuse in Antofagasta.

  • Name Blurred
  • Position: CEO (Chief Executive Officer)
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: CFO (Chief Financial Officer)
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Business Development Manager
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Project Manager
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Head of Procurement
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: HR Director
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: HR Director
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Production manager
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: Marketing manager
  • Phone: Blurred
  • Corporate email: Blurred
  • Name Blurred
  • Position: COO (Chief Operating Officer)
  • Phone: Blurred
  • Corporate email: Blurred

Subscribe to Latin America’s most trusted business intelligence platform.

Other projects in: Water & Waste

Get critical information about thousands of Water & Waste projects in Latin America: what stages they're in, capex, related companies, contacts and more.

Other companies in: Water & Waste

Get critical information about thousands of Water & Waste companies in Latin America: their projects, contacts, shareholders, related news and more.

  • Company: Veolia SU Chile S.A.  (Veolia Chile)
  • Veolia SU Chile S.A. (Veolia Chile) is a subsidiary of Spain's Proactiva Medio Ambiente, which is controlled by French firm Veolia Environnement, a global provider of environmen...
  • Company: Veolia Servicios Perú S.A.C.  (Veolia Perú)
  • Veolia Servicios Perú S.A.C. (Veolia Perú), a subsidiary of French Group Veolia, provides integrated environmental management services (water and waste). The company offers solu...
  • Company: Siemens S.A. de C.V.  (Siemens México)
  • Siemens S.A de C.V. (Siemens Mexico) is the local subsidiary of German technology company Siemens A.G. With headquarters in Mexico City, the company has been present in the coun...
  • Company: Grupo EP
  • The description contained in this profile was taken directly from an official source and has not been edited or modified by BNamericas researchers, but may have been automatical...

Project information

Full name
New Wastewater Treatment Plant (PTAS) for reuse in Antofagasta
Project Status
Active
Type of Ownership
Private
Project Type
Blurred
Capex
Blurred